Know who's hauling, what arrived, and what it costs.
From the call to the hauler to the ticket at the site, the details should stay with the job. Connect the commitment, daily coverage, received work, and hauling spend in one operating thread.
One hauling job, one thread
East pad / hauling order
Hired hauling
Six trucks to move base to the site.
Today's coverage
Six trucks confirmed
Against the job's hauling commitment
Field tickets
23 loads reported
Order
Agreed work
Call off
Daily trucks
Receive
Field tickets
Review
Hauling cost
You do not need to own trucks to own the hauling plan.
A contractor may create the work and hire every load. A GC may buy and receive hauling without running production. Both need a clear record of what was committed and what arrived.
You create the hauling need.
The phase calls for material to move. Define the site, material, day, and receiving point, then secure the hauling to cover it.
You buy and receive hauling.
Start with the hauling order for the job. Follow the hauler's commitment and the loads your site receives, without a production plan you do not run.
Both paths come back to the same questions: what was ordered, what was received, and what does hauling cost to date?
Give the hire a record before the trucks roll.
For a job that needs six trucks, keep the hauling partner, agreed terms, today's call-off, and remaining commitment in view. If your own fleet also runs, tie those trucks to the same job.
The partner and the project team each know what they committed to without sharing an entire back office.
East pad / hauling order
Six trucks to cover the phase
Hired capacity
Hauling partner
Committed to the job
Agreed work
Material, route, rate
Today
Six trucks called off
Remaining
Visible against the order
Field tickets / East pad
23 loads reported
Load 023 / 24.5 tons
Scale ticket and site photo stay with the load.
Needs review
Resolve the two tickets that do not match.
Hauling & disposal
Cost to date from accepted work.
Know what arrived, not just what was scheduled.
Bring load counts, scale tickets, and site evidence back to the job. The field can see what needs review before the back office works out what the hauler is owed.
The team can see hauling and disposal cost to date, with each amount traceable to the work behind it.
Keep the handoffs connected without losing ownership.
The project, the hauler, the site, and the office need different views of the same work. The handoff should carry context without giving every company access to everything.
Knows the commitment
See the hauler, agreed work, today's coverage, and what remains on the order.
Covers the day
Confirm trucks and return tickets while running their own operation.
Checks what arrived
Review the loads, ticket evidence, and anything that does not match.
Closes the record
Trace accepted work to the hauler bill and hauling cost to date.
Construction operations, with hauling at the center.
The same project context can extend to equipment, vendors, schedules, and financial decisions. Hauling stays native to the work, not an afterthought in a general project tool.
Bring a real hauling job.
We will map how your team orders trucks, receives tickets, and follows hauling and disposal spend across the project and its partners.
Built for contractors, brokers, haulers, dispatchers, and drivers